TOTAL: £0.00
home

email


Products

MDN29


Overview

Multi-Network Digital Display

The MDN multi-functional digital display from Masterclock syncs to an internal or external NTP (Network Time Protocol) source for accurate, USNO legally traceable time. Alternatively, the MDN can be remotely programmed to sync to and display IRIG B or choose to auto detect and display varieties of IRIG analog (CS3) and digital (CS5) countdown time codes or planned times that can be received by cable or from an almost unlimited choice of counts available by Ethernet by using Masterclock CS5 Ethernet injectors.
 

Technical

  • 2.3 inch (5.8 cm) LED digits in red, green, blue, or amber
  • Supports CS5, CS3, IRIG-B1, NTP
  • Fully configurable via WinDiscovery software, Telnet, or SSH
  • Configurable time zone and daylight saving time offsets
  • Configuration is saved to non-volatile memory and survives power losses
  • Display time in 12 or 24 hr format - hh:mm:ss
  • Display hundredths of second
  • Adjustable brightness levels
  • Visibility: 100 feet (30 meters)
  • PM indicator

Specifications

HOLDOVER ACCURACY
• With loss of power, device reverts to an internal
battery-backed real-time clock chip with accuracy of
± 1min/year or < 165ms per day
 
NETWORK COMPATIBILITY
• Supports NTP, DHCPv4, DHCPv6 for automatic
acquisition of network address, name servers, and
timeserver configuration
• Supported network protocols: Telnet/SSH
• SNMP with custom MIB
• IPv4, IPv6 compliant
 
CONNECTORS
• RJ45 for TCP/IP, IRIG-CS-3 or IRIG-CS-5246
• BNC for IRIG-B1 or IRIG-CS-3
• USB for configuration
• IEC AC Power
 
POWER
• International 115/230, 50/60 Hz
• Power consumption: < 15W
 
OPERATING PARAMETERS
• Temperature: 0 to 60°C
• Humidity: Up to 90% (non-condensing)
 
PHYSICAL
• Black powder-coated steel chassis
• Size: 22.25w x 3.6h x 2.25d in
(56.5w x 9.14h x 5.7d cm)
• Weight: 4.6 lb (2.08 kg)
 
COMPLIANCE
• FCC, ROHS, CE Marked, ANSI

Ordering information

There are a range of options available. Please contact Sarsen to discuss your project requirements.